The first domestically manufactured methanol synthesis reactor was installed at Sabalan 2 Petrochemical Plant.

The first domestically manufactured methanol synthesis reactor, which was localized and manufactured by the Petrofarhang and Energy Sepehr Holding Company at Arak Machine-Machining Company, was installed today, Monday, Esfand 13, 1403, in Phase 2 of Sabalan Petrochemical Company.

 

This equipment, weighing approximately 360 tons, 6 meters and 50 centimeters in diameter and 11 meters and 70 centimeters in height, is made of carbon steel material and includes 2,815 internal tubes, which has been localized for the first time in the country and has prevented the country from losing tens of millions of dollars of foreign exchange .

 

Previously, for the first time in the country, 30 special process equipment was ordered in the subsidiaries of this holding company, and the country did not lose tens of millions of dollars of foreign exchange .

Short link:
https://petrofarhang.com/?p=7856

Leave a Reply

Your email address will not be published. Required fields are marked *

Video Gallery

A look at the meeting of the board of directors of Petrofarhang and its subsidiaries

Petrofarhang Holding became profitable for the second consecutive year The meeting of the board...

Read More

Seven major achievements arising from a strategic merger

On Mordad 24 of last year, Javad Zarepour, CEO of Petrofarhang Holding, announced...

Read More

Message from the CEO of Petrofarhang Holding on the occasion of the 17th anniversary of the holding’s establishment

Dear Shareholders Esteemed Colleagues I congratulate you on the 2nd of Tir, the anniversary of...

Read More

The performance of Petrofarhang’s subsidiary companies was reviewed

In the presence of Ali Sayadizadeh, Deputy Director of Corporate Affairs and Assemblies...

Read More

The news network broadcasted; National media report on the role of Petrofarhang Holding in the self-sufficiency of Iran’s petrochemical industry Petrofarhang Holding

The news network broadcasted; National media report on the role of Petrofarhang Holding...

Read More

Petrofarhang Paving the Way in Iran’s Petrochemical Industry: 12th Localized Process Equipment Dispatched to Siraf Energy Petrochemical Plant

Petrofarhang Paving the Way in Iran’s Petrochemical Industry: 12th Localized Process Equipment Dispatched...

Read More

A look at the presence of Petrofarhang Holding on the last day of the 29th International Oil Exhibition in Tehran.

The conclusion of Petrofarhang's first upstream contract, the signing of a memorandum of...

Read More

Javad Zarepour signed an upstream field development agreement with the National Iranian Oil Company and two other companies for the first time in Petrofarhang’s history

The National Iranian Oil Company, Petrofarhang Holding, Bakhtar Group and Hana Energy Gostar...

Read More