Petrofarhang Gas Fields Development Company

Company Introduction

The development plan for the Pazan and Gardan gas fields will be planned and carried out under an IPC (Iran Petroleum Contract) framework, in two phases over 7 years. Its goal is to reach a daily production of about 15.25 million cubic meters of gas from the Gardan field and 15.60 million cubic meters of gas from the Pazan field. Upon completion of the second phase, a total of 24 wells will come on stream, and over the 20-year contract period, cumulative production of about 179.5 billion cubic meters of gas (with a recovery factor of 38 percent) and about 58.2 million barrels of gas condensate will be achieved.

Other objectives of the plan:

  • Developing the Gardan and Pazan gas fields and reaching a gas flow rate of 31.5 million cubic meters per day
  • Main activities of the plan:
  • Workover of 4 wells / drilling of 19 new wells / drilling of one exploration well
  • Construction of surface facilities, including flowlines, gathering centers, slug catchers, separation centers, etc.
  • 3D seismic surveys of the Pazan and Gardan fields
  • Construction of operation camps in Pazan and Gardan
  • Laying about 310 kilometers of gas and condensate transmission pipelines

Study and preliminary activities began in 2025, and the first execution phase of the plan started in 2026.

Geographical location:

Pazan field: 177 km south of Shiraz and 58 km northwest of Mohr County

Gardan field: 135 km south of Shiraz and 36 km southeast of Dehram County

(These fields contain rich gas in the Kangan, Dalan and Nar formations.)

Shareholders

Petrofarhang Company
30%
Bakhtar Group
60%
Hana Energy
10%