Successful installation of two heat exchangers at Siraf Energy Petrochemical Company

According to the public relations of Siraf Energy Petrochemical, the installation of two heat exchangers E_2021/1 and E_2021/2, each weighing approximately 130 tons (about 127.300 net tons), related to the secondary reformer section, was successfully completed.

These strategic equipment, which are considered vital components of the reformer unit, were completely designed and manufactured by Arak Machinery Company. Their operation is an important step on the path to localization and self-sufficiency of petrochemical industry equipment.

The installation process of these heavy-duty exchangers was carried out in strict compliance with all safety principles and standards, along with planning, engineering and continuous supervision by Siraf Company’s specialized teams. The success in implementing this operation demonstrates the high capabilities of Siraf Energy colleagues in managing sensitive industrial projects.

Hasan Nozhat, CEO of Siraf Energy Petrochemical Company, stated:

“The successful installation of these two heat exchangers is a clear symbol of reliance on the capabilities of domestic engineers and manufacturers. The realization of such projects, while reducing dependence on foreign countries, paves the way for sustainable development and improving the status of the country’s petrochemical industry.”

He added: “Siraf Energy Company has always tried to complete large and complex projects with the highest quality and in the shortest possible time, relying on domestic capacities and the cooperation of capable Iranian manufacturers. Achieving such successes reflects the collective will for self-sufficiency and the development of national infrastructure.”

In conclusion, the CEO of Siraf Energy Petrochemical Company, while appreciating the relentless efforts of the project’s employees and contractors, emphasized: “This achievement is only part of our path forward, and by continuing this trend, we will have brighter horizons in the field of development and progress of the project ahead.”

لینک کوتاه:
https://petrofarhang.com/?p=9844

Leave a Reply

Your email address will not be published. Required fields are marked *

پترو گالری

Conducting a meeting of the Petrofarhang and Subsidiaries’ Board of Directors with the presence of the CEO of Farhangian Reserve Fund

The meeting of the Petrofarhang Holding and Subsidiaries' Board of Directors was held...

Read More

Successful installation of two heat exchangers at Siraf Energy Petrochemical Company

According to the public relations of Siraf Energy Petrochemical, the installation of two...

Read More

Coinciding with Government Week, a look at the investment portfolio of Petrofarhang Holding

In conjunction with Government Week with the slogan "Government alongside the people, twelve...

Read More

Meeting to review human resources programs of companies based in Assaluyeh

Meeting to review human resources programs of companies based in Assaluyeh The human resources...

Read More

Petrofarhang CEO visits holding subsidiaries in Bushehr province

Dr. Javad Zarepour, CEO and Vice Chairman of the Board of Directors of...

Read More

Message from the CEO of Petrofarhang Holding on the occasion of the 17th anniversary of the holding’s establishment

Dear Shareholders Esteemed Colleagues I congratulate you on the 2nd of Tir, the anniversary of...

Read More

A look at the four days of Petrofarhang Holding’s presence at the 29th International Oil Exhibition

Simultaneously with the 29th International Oil, Gas, Refining and Petrochemical Exhibition in Tehran,...

Read More

29 pictures of Petrofarhang’s presence at the 29th Tehran International Oil and Petrochemical Exhibition

‎Along with the 29th Tehran International Oil, Gas, Refining and Petrochemical Exhibition, Petrofarhang...

Read More